The recent Work Party at Langford Bridge was attended by 5 members – 4 of which were OAP’s. A very poor turn out.

However managed by Tommy Eldridge they carried out work on 9 swims around the lake, plus strimming and mowing of the banks.

Other work was also carried out on the river bank following on from the excellent recent heavy work by our contractors – Woodwards – in lopping and pruning trees on the top stretch of the river ready for winter fishing. The chippings from the tree work are to be used for the swims around the lake